On October 3 to 8, 2020, Minh Ha Company carries out the inspection and maintenance of the electrical system, pump and valve for the TAN CANG 86 tug board to the dock, ensuring technical and ship owners' requirements.
All equipment is tested, pressure tested & operated to ensure the approval of the units, as well as:
- Ensuring construction items according to the requirements and progress of the ship owner.
- Fully equipped with specialized equipment, tools and tools necessary for the job.
- Responsible for ensuring labor safety, maintaining solidarity in the repair process.
- 06-month warranty for processing and repairing items from the date of signing the acceptance report, handing over the completed work.
Some pictures.
Website link